SECTOR 2/8
SELECT MISSION
Six projects. Open one for the full case study: what I did, how, and what the numbers say. The ones marked 3D have models you can spin.
MSN 01 · Mar 2026 – Present 3D
Duke Solar SailCFRP Frame Structure
27.6 Hz first mode, Python FEA vs. the 20 Hz launch-stiffness floor
MSN 02 · Sep 2025 – Present
CubeSatAtmospheric Sensing System
28 km peak altitude logged in flight
MSN 03 · May 2026 – Present
PlantogachiSensor-Driven Plant-Care Device
$32 prototype BOM ($11 quoted at bulk)
MSN 04 · Spring 2026 3D
McRocketHappy Meal Toy Designed for Injection Molding
< $0.36 per unit in the DFM cost model
MSN 05 · Spring 2026 3D
Sunflower Seed Shelling MachineHand-Powered Mechanism
Fastest machine across all 4 sections of Duke's EGR 121 design course
MSN 06 · Fall 2025
Tiger Enrichment DeviceNorth Carolina Zoo, Client Project
400 lb static load, no damage
Not shown: FaunaLabs, Embedded & Mechanical Intern, Mar–Sep 2026. I qualified a whale-tag enclosure to 20 MPa, designed a timed-release link, and fixed a Cortex-M7 cache/DMA race that cut dropped sensor frames 90%, with 97% uptime across the deployed fleet. Publishing is restricted.